Talks of Record The AI Buildout

How the machine behind AI works, told by the people who build it.

Power

  1. Power generationGas turbines, nuclear, renewables and on-site power for data centers.
  2. Grid and transformersTransmission, interconnection queues, substations and transformer supply.
  3. Power deliveryFrom the service entrance to the chip, including switchgear, busbars and 800V DC.
  4. CoolingLiquid, immersion and air cooling, and how heat leaves dense racks.

Building and chips

  1. Construction, siting and workforceSite selection, permits, schedules and the electricians to build it.
  2. Chip packagingCoWoS, interposers, substrates and where packaging capacity sits.
  3. MemoryHigh-bandwidth memory, DRAM supply and the main suppliers.
  4. NetworkingEthernet, InfiniBand and optics between accelerators and sites.

Start with these

Receipts

  • This is going to drive 10 times more power consumption in Europe for AI compute this year.

    OCP 2026 EMEA Keynote, , Watch at 40:46

  • we are currently at 150 kilowatts. By the end of the year, we'll be in the 250 and next year, yes, we are going to have a rack that we are going to need all these side casts because it's going to move very fast to 650 kilowatts and the year after Jensen already announced the the one megawatt rack.

    OCP 2026 EMEA Keynote, , Watch at 47:00

  • for the second half of 2026 we will have GPUs that will have a scale up interface 14.4 terabit per second coming in and also going out of the chip

    Peter Ossieur, , Watch at 3:12

  • by OFC of 2027, we will deliver the rev the rev 1.1 version of the Open MSA spec.

    A Pathway to 224 448 Gbps Copper and Optical Connectivity in AI Infrastructure, , Watch at 13:20

  • in the middle is a power center. Right? Shooting for Q2 next year. And then very quickly 2028, like I said, that's where we're going to have our 800 DC native rack

    Delta 800 VDC Power and Cooling Solutions for Data Centers presented by Delta, , Watch at 18:52

  • the Gen 4 is still secret here, but that's exactly a native ALC rack, which is planned for 2028 deployment.

    Delta 800 VDC Power and Cooling Solutions for Data Centers presented by Delta, , Watch at 4:47

  • they said it's going to be about 15 billion dollars by the end of 2029, which I believe it is a conservative number.

    OCP 2026 EMEA Keynote, , Watch at 5:08

  • According to IDC, Microsoft AI and Cloud Infrastructure in Spain will add more than€ 10 billion euros to the national GDP and it will contribute to the creation of over 77,000 jobs by 2030.

    OCP 2026 EMEA Keynote, , Watch at 1:23:43

  • we were deploying one gigawatt in one location. So, let's rewind 15 years, one gigawatt AC deployed across the world, and now we're putting it in one location. Crazy. Well, not that crazy because over the next few years, we're going to be putting five of those in one location in our Hyperion data center

    OCP 2026 EMEA Keynote, Watch at 2:30:50

  • for the Gen 3, the next generation, we're pushing 570 kW per per rack capacity

    Delta 800 VDC Power and Cooling Solutions for Data Centers presented by Delta, Watch at 4:36

  • the 50-V voltage is not the right choice anymore to power compute rack with 1 MW of power dissipation. So, we will head to 800-V distribution.

    Delta 800 VDC Power and Cooling Solutions for Data Centers presented by Delta, Watch at 0:59

Last updated November 2026.